Fredericton Convention Centre
Testimonial:
Project name: Fredericton Convention Centre
Sq ft – 77,000 square feet building, 36,000 sq ft meeting and function space
CSA Enterprises and Atlantic interface and controls were involved heavily in our project from an overall lighting standpoint and the modern lighting controls in our facility. The products supplied on this job were leading edge with a large component being LED and sophisticated control systems for the ball room, all meeting rooms, and common areas. Both dimming/ low voltage lighting systems consisted of scene control stations, daylight harvesting, occupancy sensing, time clock scheduling, and BMS Integration. Both CSA and AIC worked very close with the architect, engineer, distributor, contractor, and facility manager to ensure all needs were met.
Mr. William Whitlock, president of AIC was on site numerous occasions working with the contractor, and facility management team to lay out the wiring, assist in trouble shooting, start up and commission the system, end user training, etc. Because William and his company are located in Halifax (approx. 4 hour drive) we receive 24hour service to our lighting control system if and when needed.
We are EXTREMELY happy with the overall project and the products and services offered by both these companies and would highly recommend them for future lighting and lighting controls projects.
Cathy Pugh
General Manager
Fredericton Convention Centre